Planning Advisory Committee Reports
2010
Regional forum for interested parties to provide input to ISO-NE concerning the assessment and development of the Regional System Plan (RSP) and the conduct of system enhancement and expansion studies.

Date Document Title Document Type  
Dec 17, 2010 PDF (515k)
Dec 17, 2010 PDF (24.7Mb)
Sep 20, 2010
password-protected
PDF (339k)
Sep 20, 2010
password-protected
PDF (2.0Mb)
Aug 10, 2010
password protected
PDF (1.7Mb)
Jul 09, 2010
2013 Design and Sensitivity N-1 Voltage Violation Results, Final Version, Appendix G (password protected)
PDF (29.1k)
Jul 09, 2010
Final Version (password protected)
DOCX (4.2Mb)
Jul 09, 2010
2013 Design Case N-1 Results, Final Version, Appendix G (password protected)
PDF (39.7k)
Jul 09, 2010
2018 Design Case Mystic BackDown FastStart N-1-1, Final Version, Appendix G (password protected)
PDF (2.4Mb)
Jul 09, 2010
2018 Sensitivity Case Mystic BackDown FastStart N-1-1, Final Version, Appendix G (password protected)
PDF (2.1Mb)
Jul 09, 2010
2013 Sensitivity Case Mystic BackDown FastStart N-1-1, Final Version, Appendix G (password protected)
PDF (1.7Mb)
Jul 09, 2010
2018 Design and Sensitivity N-1 Voltage Violation Results, Final Version, Appendix G (password protected)
PDF (60.8k)
Jul 09, 2010
Final Version (password protected)
ZIP (4.9Mb)
Jul 09, 2010
2013 Sensitivity Case N-1 Results, Final Version, Appendix G (password protected)
PDF (26.5k)
Jul 09, 2010
2018 Sensitivity Case N-1 Results, Final Version, Appendix G (password protected)
PDF (80.9k)


  Copyright ©2014 ISO New England Inc.